PV ADU Advisor
Your guide to Accessory Dwelling Unit feasibility and incentives.
Feasibility Assessment
Chapter 150 & Specialized Stretch Code Applied
Feasibility Status
Likely Feasible
Feasibility Score
Top 3 Reasons:
- Lot size exceeds minimum requirement.
- Zoning allows for detached ADUs.
- No apparent septic system constraints.
All-Electric ADU Requirements
- Heat Pump HVACIncentive-Required
- Heat Pump Water HeaterIncentive-Required
- Induction CooktopOptional Add-On
- Energy Recovery (ERV/HRV)Incentive-Required
- HERS Target MetIncentive-Required
Available Incentives Preview
Potential Incentives Identified
$32,500
+ Financing Options Available
Mass Save
$25,000
Passive House Tier
Incentive-Required
$15,000
NextGen Tier
Incentive-Required
IRA
$7,500
Federal Tax Credit
Optional Add-On
Amherst Local Program
Property Location
123 Green Way, Amherst, MA
Live Map View
Your Project Partners

Cape Cod Panel – Pre-identified fabrication partner, onboarded upon award.
High-Performance Panel Fabricator
Network Partner

Petersen Engineering – Passive House MEP consultant, ready for integration.
Building Science & Energy Modeling Consultant
Network Partner

On award, partner onboarded.
Licensed ADU Builder - Regional
Network Partner
Execution Roadmap
- 1
Site Assessment
2 weeksParcel review, zoning check, and utility hosting capacity analysis.
- 2
Design & Compliance Modeling
4 weeksArchitectural design, energy code compliance, and HERS rating simulation.
- 3
Partner Build
8-10 weeksOnboarding of prefab, building science, and builder partners.
- 4
Incentive Capture
2-3 weeksSecuring Mass Save, IRA, and local rebates upon project completion.